Redl-Zipf concentration camp
Neukirchen an der Vöckla, Austria
The Redl-Zipf V-2 rocket facility (code name Schlier) located in central Austria between Vöcklabruck and Vöcklamarkt and established in September 1943 began operation for V-2 liquid oxygen production and rocket motor testing after oxygen machines originally earmarked for Raxwerke and combustion chamber test equipment from Friedrichshafen were moved there. The facility tested V-2 combustion chambers' compatibility with turbopumps since the rocket did not have a controller for reducing the turbopumping of propellant into the chamber if pressure became too high. The World War II facility used as a starting base the cellars and storage tunnels of an old brewery. Construction of the facility was under the command of SS-Obergruppenführer Hans Kammler who was responsible for Nazi civil engineering projects and its top secret weapons programs and used forced labor from the Schlier-Redl-Zipf subcamp of the Mauthausen-Gusen concentration camp. The construction added a large number of tunnels and supporting structures and included a liquid oxygen generation plant in one of the tunnels. A large explosion on 29 February 1944, killed 14 people, destroyed several installations, and halted production of liquid oxygen at the facility for almost two months. A report to Albert Speer indicated the cause of the explosion was a liquid oxygen leak and an open carbide lamp carried by the plant forema
Prison data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).