Rapides-des-Cœurs Generating Station
La Tuque, Canada
The 2747th largest power station in the world
The Rapides-des-Coeurs generating station is a hydroelectric plant and dam erected on the Saint-Maurice River by Hydro-Québec near of Windigo, in the administrative region of Mauricie, in Quebec, in Canada. This plant and the Chute-Allard Generating Station located upstream were put into service in 2008. The construction was completed in 2009. The hydroelectric plant of Rapides-des-Coeurs generates an output of 76 MW. The main dam is based on rockfill, located on the river. The intake has six sluices and six forced to feed six turbine/generator of SAXO type. The drop height is 22.50 m. The spillway is equipped with valves. Hydro-Québec provides management of ecological river flow.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).