Karabulun Hydro Power Plant
Kyrgyzstan
The Kazarman hydropower cascade is a future hydropower project near Kazarman in Jalal-Abad Region, Kyrgyzstan. When completed, it will consist of 4 hydropower plants on the river Naryn: Ala-Buga, Kara-Bulung-1, Kara-Bulung-2 and Toguz-Toro, with a total installed capacity of 1160 MW.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).