He Dreiht Offshore Wind Farm
Exclusive economic zone of Germany in the North Sea, Germany
The 945th largest power station in the world
The He Dreiht offshore wind farm is under construction in the German exclusive economic zone of the North Sea, approximately 85 km north of the island of Borkum and approximately 104 km west of the island of Heligoland. The installed capacity is expected to be 960 MW, and commissioning is planned in stages until spring 2026. EnBW secured a contract for 900 MW for He Dreiht in April 2017. In the tender under the Offshore Wind Energy Act, EnBW offered 0.00 cents per kilowatt hour, thus securing grid connection capacity without entitlement to a market premium under the Renewable Energy Sources Act. On March 23, 2023, the investment decision for 64 turbines with a total capacity of 960 MW was made. At the same time, EnBW sold a 49.9% stake in the wind farm to a consortium consisting of the Norwegian sovereign wealth fund, Norges Bank Investment Management, the Danish infrastructure investment platform AIP Management, and the German private equity arm Allianz Capital Partners. As of July 2025, EnBW still has 50.1% and AIP, Allianz and Norges Bank each have one third of 49,9 %. EnBW has also secured long-term financing of 600 million Euro from the European Investment Bank. Following an EU-wide tender, EnBW awarded the contract to supply the offshore wind turbines to Vestas Wind Systems. The turbine type is the V236-15.0MW, with a capacity of 15 megawatts and a rotor diameter of 236
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).