Bumbuna II Hydroelectric Power Station is a planned 143 megawatts (192, 000 hp) hydroelectric power station in Sierra Leone. The power plant is under development by a consortium of renewable energy IPPs and investors, led by Joule Africa Limited. The energy generated here will be sold to Electricity Distribution and Supply Authority (EDSA), the electricity utility company of Sierra Leone, under a 25-year power purchase agreement. In July 2025 it was reported that the Sierra Leone government had abandoned the project because the cost was unsustainable.