Barrow Offshore Wind Farm

See all in United Kingdom →

United Kingdom

The 2651st largest power station in the world

90 MW · Capacity

The Barrow Offshore Wind Farm is a 30 turbine 90MW capacity offshore wind farm in the East Irish Sea approximately seven kilometres (four nautical miles) southwest of Walney Island, near Barrow-in-Furness, Cumbria, England. Construction of the wind farm took place between 2005 and 2006. The farm is operated by Barrow Offshore Wind Limited, owned by Ørsted A/S.

Barrow wind farm was a UK Round 1 wind farm development originally developed by Warwick Energy Limited. A planning application was submitted in 2001, and planning consent given in March 2003; the project was sold to Centrica (25%, c.£22.5million), Ørsted A/S (then named DONG Energy) (37.5%), and Statkraft (37.5%) in Sep. 2003. The estimated cost of developing the project was £100 million, of which £10million was provided by a UK government grant. In 2004 Centrica and Ørsted bought the Statkraft stake, forming a 50:50 joint venture in the development. The initial Warwick Energy proposal was for a 30 turbine wind farm 7 km southwest of Walney Island (Cumbria), with a generating capacity of up to 108 MW; electrical power supply to the mainland was to be via a ~25 km long 132 kV cable making groundfall near Heysham, with connection to the mainland electrical grid at an extension to an existing electricity substation south of Heysham nuclear power station. Turbines were expected to have ~50m radius blades, with a 75m hub height, and be in water at a depth of ~20 m, with a ~32.5 m sub-sea bed monopile foundation; the turbines were to be spaced approximately 500 m apart in four rows aligned to face the prevailing southwesterly winds, with a row spacing of ~750 m.

In July 2004 Kellogg Brown & Root Ltd and Vestas-Celtic Wind Technology Ltd were awarded the contract to install and commission the wind farm, and to operate the wind farm for five years. A 30-turbine wind farm with a capacity of 90MW was constructed by the consortium between July 2005 and May 2006. The main construction base was at Harland and Wolff's shipyard in Belfast. In exceptions where pile driving of monopile foundations failed, drilling was used to form the monopile foundations. IEC 1A class Vestas V90-3.0 MW wind turbines were used, mounted o

Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).

More power stations in United Kingdom

  1. Drax power station3.96 GW
  2. Longannet power station2.4 GW
  3. Pembroke B Power Station2.18 GW
  4. Ratcliffe-on-Soar power station2.12 GW
  5. Eggborough power station1.96 GW

Other large power stations worldwide

  1. Bui Dam · Ghana1,440 GW
  2. Western Green Energy Hub · Australia50 GW
  3. Gujarat Hybrid Renewable Energy Park · India30 GW
  4. Three Gorges Dam · China22.5 GW
  5. Baihetan Dam · China16 GW
  6. Itaipu Dam · Paraguay14 GW
  7. Xiluodu Dam · China13.86 GW
  8. Belo Monte Dam · Brazil11 GW