Bali Refuse Incineration Plant

See all in Taiwan →

Bali District, Taiwan

The Bali Refuse Incineration Plant (traditional Chinese: ; simplified Chinese: ; pinyin: Bālǐ Lèsè Fénhuà Chǎng) is an incinerator in Bali District, New Taipei, Taiwan. The chimney of the incineration plant is 150 m (490 ft) tall.

The construction of the plant started in 1997 and completed in 2001. With a total area of 3.5 hectares, the plant began its commercial operation the same year.

The plant has a capacity of treating 1,350 tons of garbage per day. To prevent the dissolved dioxin components from recomposing back to life due to temperature drop, an activated carbon injection unit is installed to adsorb heavy metals and dioxins by its porous nature, resulting in a clean air treatment.

Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).

More power stations in Taiwan

  1. Taichung Power Plant5.78 GW
  2. Tatan Power Plant4.98 GW
  3. Hsinta Power Plant4.33 GW
  4. Mailiao Power Plant4.2 GW
  5. Tunghsiao Power Plant3.77 GW

Other large power stations worldwide

  1. Bui Dam · Ghana1,440 GW
  2. Western Green Energy Hub · Australia50 GW
  3. Gujarat Hybrid Renewable Energy Park · India30 GW
  4. Three Gorges Dam · China22.5 GW
  5. Baihetan Dam · China16 GW
  6. Itaipu Dam · Paraguay14 GW
  7. Xiluodu Dam · China13.86 GW
  8. Belo Monte Dam · Brazil11 GW